| Document Number
 | Description | Author | File Type and Size
 | 
| 98-219r5 | Cable Media Performance Testing | Ed Armstrong, Zane Daggett, Bill Ham, Martin Ogbuokiri | PDF (1059745) | 
| 98-238r3 | Passive Lumped Capacitance Compensation on SCSI Signal Lines | Vit Novak | PDF (331805) | 
| 99-012r0 | Agenda for T10 Meeting #34 (November '99) | J. Lohmeyer | PDF (4442) | 
| 99-013r0 | T10 Project Summary - September '99 | J. Lohmeyer | PDF (4918) | 
| 99-014r0 | Jeopardy Letter for November '99 meeting | J. Lohmeyer | PDF (10298) | 
| 99-015r0 | Letter Ballot on forwarding SPI-3 to first public review | J. Lohmeyer | PDF (3444) | 
| 99-111r4 | Recommendations for content in SPI-3 relating to cable performance | Bill Ham | PDF (10396) | 
| 99-111r5 | Recommendations for content in SPI-3 relating to cable performance | Bill Ham | PDF (11078) | 
| 99-111r6 | Recommendations for content in SPI-3 relating to cable performance | Bill Ham | PDF (12266) | 
| 99-111r7 | Recommendations for content in SPI-3 relating to cable performance | Bill Ham | PDF (12432) | 
| 99-142r0 | Flow Control | Larry Lamers | PDF (21413) | 
| 99-148r2 | Proposal for Storage and Access of Data on Media Auxiliary Memory | Ian 'Sid' Crighton | PDF (110628) | 
| 99-179r3 | Logical Unit Self Tests | Mark Evans | PDF (40188) | 
| 99-179r4 | Logical Unit Self Tests | Mark Evans | PDF (42119) | 
| 99-179r5 | Logical Unit Self Tests | Mark Evans | PDF (41513) | 
| 99-202r1 | Minutes of T10 Plenary Meeting #32 -- July 15, 1999 | Weber & Lohmeyer | PDF (454719) | 
| 99-206r1 | MCM Additions to Fibre Channel Control page in FCP-2 | George Penokie | PDF (19530) | 
| 99-206r2 | MCM Additions to Fibre Channel Control page in FCP-2 | George Penokie | PDF (19783) | 
| 99-215r1 | Crosstalk Issues with 99-111r5 | Paul Aloisi | PDF (13947) | 
| 99-218r0 | Project Proposal for SMC-2 Standard | Erich Oetting | PDF (5550) | 
| 99-218r1 | Project Proposal for SMC-2 Standard | Erich Oetting | PDF (5482) | 
| 99-218r2 | Project Proposal for SMC-2 Standard | Erich Oetting | PDF (5504) | 
| 99-223r1 | Proposal for Storage and Access of Data on Media Auxiliary Memory | Sid Crighton | PDF (178267) | 
| 99-223r2 | Proposal for Storage and Access of Data on Media Auxiliary Memory | Steve Jerman | PDF (153915) | 
| 99-225r0 | QAS Arbitration Fairness | Rob Elliott | PDF (39382) | 
| 99-226r0 | Mode Page 19h DSA bit Clarification in FCP-2 | Jim Coomes | PDF (5376) | 
| 99-226r1 | Mode Page 19h DSA bit Clarification in FCP-2 | Jim Coomes | PDF (6013) | 
| 99-226r2 | Mode Page 19h DSA bit Clarification in FCP-2 | Jim Coomes | PDF (5657) | 
| 99-227r0 | Task management handling changes for SPI-3 | George Penokie | PDF (23848) | 
| 99-227r1 | Task management handling changes for SPI-3 | George Penokie | PDF (24682) | 
| 99-227r2 | Task management handling changes for SPI-3 | George Penokie | PDF (25027) | 
| 99-227r3 | Task management handling changes for SPI-3 | George Penokie | PDF (21982) | 
| 99-228r0 | Approved responses to SSC letter ballot comments | Dave Peterson | PDF (48244) | 
| 99-228r1 | Proposed response to SSC letter ballot comments | Dave Peterson | PDF (50556) | 
| 99-229r0 | Restricting Mode Page Code Usage | Ralph Weber | PDF (7403) | 
| 99-230r0 | Extended Copy Support for Persistent Reservations | Ralph Weber | PDF (15237) | 
| 99-230r1 | Extended Copy Support for Persistent Reservations | Ralph Weber | PDF (15593) | 
| 99-231r0 | EXTENDED COPY and Abort Task Management Functions | Ralph Weber | PDF (10486) | 
| 99-231r1 | EXTENDED COPY and Abort Task Management Functions | Ralph Weber | PDF (8553) | 
| 99-232r0 | SAM-2 Tasks and Work | Ralph Weber | PDF (8494) | 
| 99-232r1 | SAM-2 Tasks and Work | Ralph Weber | PDF (10384) | 
| 99-233r0 | SAM-2 TASK SET FULL Clarifications | Ralph Weber | PDF (9073) | 
| 99-233r1 | SAM-2 TASK SET FULL Clarifications | Ralph Weber | PDF (9176) | 
| 99-233r2 | SAM-2 TASK SET FULL Clarifications | Ralph Weber | PDF (10243) | 
| 99-234r0 | SMU Note for SPC-2 | Ralph Weber | PDF (7646) | 
| 99-236r0 | Minutes of SCSI signal modeling study group (draft) - July 29, 1999 | Dean Wallace | PDF (12382) | 
| 99-236r1 | Minutes of SCSI signal modeling study group (approved) - July 29, 1999 | Dean Wallace | PDF (21055) | 
| 99-237r0 | Draft IS on SCSI Controller Commands - 2 (SCC-2) | ISO/IEC | PDF (1856470) | 
| 99-238r0 | Response to NCITS 330 (RBC) 1PR comment #1 from Ralph Weber | John Lohmeyer | PDF (5672) | 
| 99-239r0 | Project Proposal for SCSI on Scheduled Transfer (SST) | Roger Ronald | PDF (24641) | 
| 99-239r1 | Project Proposal for SCSI on Scheduled Transfer (SST) | Roger Ronald | PDF (5910) | 
| 99-240r0 | Minutes of Joint T11/T10 Tape ad hoc Meeting - Aug 4, 1999 | Stewart Wyatt | PDF (17733) | 
| 99-241r0 | SPI-3 Setup and Hold Timings text changes | Rob Elliott | PDF (10045) | 
| 99-242r0 | Proposed addition to SPI-3 integrity check fall back procedure | John Lohmeyer | PDF (10059) | 
| 99-242r1 | Proposed addition to SPI-3 integrity check fall back procedure | John Lohmeyer | PDF (10772) | 
| 99-242r2 | Proposed addition to SPI-3 integrity check fall back procedure | John Lohmeyer | PDF (10631) | 
| 99-243r0 | Project Proposal for SCSI Signal Modeling (SSM) | Bill Ham | PDF (7953) | 
| 99-243r1 | Project Proposal for SCSI Signal Modeling Technical Report (SSM) | Bill Ham | PDF (13275) | 
| 99-244r0 | References to signal integrity publications | Bill Ham | PDF (11607) | 
| 99-245r0 | A detailed proposal for access controls (in SPC-2) | Jim Hafner | PDF (253097) | 
| 99-246r0 | Project Proposal for SCSI VI Protocol (SVP) | Ed Gardner | PDF (10454) | 
| 99-246r1 | Project Proposal for SCSI VI Protocol (SVP) | Ed Gardner | PDF (10625) | 
| 99-247r0 | FCP-2 changes from revision 02 to revision 03 | Bob Snively | PDF (154901) | 
| 99-248r0 | Ultra N Proposal / Adaptec | Vince Bastiani | PDF (595443) | 
| 99-249r0 | Parallel SCSI Extended Addressing Proposal | Charles Monia | PDF (52928) | 
| 99-249r1 | Parallel SCSI Extended Addressing Proposal | Charles Monia | PDF (50559) | 
| 99-250r0 | Proposal for Increasing the Addressability of Parallel SCSI | Charles Monia / Larry Lamers | PDF (45942) | 
| 99-250r1 | Proposal for Increasing the Addressability of Parallel SCSI | Charles Monia / Larry Lamers | PDF (45769) | 
| 99-258r0 | List lengths that exceed maximum allocation length | George Penokie | PDF (19692) | 
| 99-258r1 | List lengths that exceed maximum allocation length | George Penokie | PDF (20483) | 
| 99-259r0 | Beyond 2 Tbytes | George Penokie | PDF (33420) | 
| 99-260r0 | SPI-4 ISI reduction via transmit pre-compensation | William Petty | PDF (22899) | 
| 99-261r0 | SPI-4 timing budget utilizing receiver signal deskew method | William Petty | PDF (35582) | 
| 99-262r0 | SPI-4 REQ/ACK ISI removal via qualified clocking method | William Petty | PDF (34125) | 
| 99-263r0 | SSC Proposal to Support Partial Loading & Unloading | Paul Suhler | PDF (10345) | 
| 99-264r0 | Margin Control | Larry Lamers | PDF (29592) | 
| 99-265r0 | Comments on SAM multi-port model (rev 8 vs. rev 11) | George Ericson | PDF (25558) | 
| 99-266r0 | Description Lengths for 5D ASC/ASCQs | Ralph Weber | PDF (8412) | 
| 99-266r1 | Description Lengths for 5D ASC/ASCQs | Ralph Weber | PDF (8912) | 
| 99-267r0 | Minutes of SCSI Physical Working Group - Sept 13-14, 1999 | Weber & Lohmeyer | PDF (61980) | 
| 99-267r1 | Minutes of SCSI Physical Working Group - Sept 13-14, 1999 | Weber & Lohmeyer | PDF (63623) | 
| 99-268r0 | Minutes of SCSI Working Group - Sept 15, 1999 | Weber & Lohmeyer | PDF (61249) | 
| 99-268r1 | Minutes of SCSI Working Group - Sept 15, 1999 | Weber & Lohmeyer | PDF (61547) | 
| 99-269r0 | Minutes of T10 Plenary Meeitng #33 - Sept 16, 1999 | Weber & Lohmeyer | PDF (426341) | 
| 99-269r1 | Minutes of T10 Plenary Meeting #33 -- September 16, 1999 | Weber & Lohmeyer | PDF (426541) | 
| 99-270r0 | Minutes of SCSI signal modeling study group (draft) - Sept 1, 1999 | Bill Ham | PDF (28599) | 
| 99-270r2 | Minutes of SCSI signal modeling study group (approved) - Sept 1, 1999 | Bill Ham | PDF (28604) | 
| 99-271r0 | Proposed revision to T10 Electronic Procedures | John Lohmeyer | PDF (10778) | 
| 99-271r1 | Proposed revision to T10 Electronic Procedures | John Lohmeyer | PDF (11826) | 
| 99-272r0 | T10 Annual Report for 1999 | John Lohmeyer | PDF (177940) | 
| 99-273r0 | Address Assignment Pins on SCA and Three-in-one SFF 8009 connectors | Gene Milligan | PDF (8182) | 
| 99-274r0 | Forcing Bus Free from QAS -- Initiator Method | Richard Moore | PDF (3155) | 
| 99-275r0 | Presentation on the project proposal for SCSI on Scheduled Transfer | Donald Woelz | PDF (12598) | 
| 99-276r0 | proposed draft for SCSI on Scheduled Transfer | Don Woelz | PDF (106040) | 
| 99-276r1 | proposed draft for SCSI on Scheduled Transfer | Don Woelz | PDF (114977) | 
| 99-277r0 | Allow WRITE BUFFER when drive not ready | Gerry Houlder | PDF (5325) | 
| 99-278r0 | Presentation: A proposal for Access Control | Jim Hafner | PDF (486193) | 
| 99-280r0 | T11 liaison report to September T10 Plenary | Neil Wanamaker | PDF (15114) | 
| 99-281r0 | STA Liaison Report to T10 - September 16, 1999 | Paul Aloisi | PDF (20418) | 
| 99-284r0 | Quote on Conversion of RBC standard to ISO/IEC document | Ron Roberts | PDF (4316) | 
| 99-286r0 | Minutes of the SCSI Cable Media Performance WG (draft) - 9/28/99 | Bill Ham | PDF (6789) | 
| 99-287r0 | Minutes of SCSI signal modeling WG (draft) - Sept 29, 1999 | Bill Ham | PDF (21992) | 
| 99-288r0 | Minutes of Joint T10/T11.3 Activity (Tape) Ad Hoc - 9/14/99 | Stewart Wyatt | PDF (18751) |