September 2013 Archives by subject
Starting: Sat Sep 7 23:01:30 PDT 2013
Ending: Mon Sep 30 08:57:04 PDT 2013
Messages: 61
- 4.15 specs for read operation are unacceptable in SBC-3 r35j
Ralph Weber
- 4.15 specs for read operation are unacceptable in SBC-3 r35j
Elliott, Robert (Server Storage)
- 4.15 specs for read operation are unacceptable in SBC-3 r35j
Elliott, Robert (Server Storage)
- Additional sense code for humidity
Kevin D Butt
- Agenda for SMR study group meeting Sept. 19
Gerry Houlder
- ANSI INCITS TR38-2005 vs ACS-3
John Geldman (jgeldman)
- Canceled: SOPQI WG
Curtis Stevens
- Comment on T10/13-138r0 SPL-3 CREDIT ADVANCE for OPEN_ACCEPT
Bill Martin-SSI
- Doubt in SAS speed negotiation sequence
Pooja Gupta
- Doubt in SAS speed negotiation sequence
Penokie, George
- draft CAP minutes are posted
John Lohmeyer
- draft SAS PHY/Protocol minutes are posted
John Lohmeyer
- draft T10 Plenary minutes posted
John Lohmeyer
- FW: Comment on T10/13-138r0 SPL-3 CREDIT ADVANCE for OPEN_ACCEPT
Craig Stoops
- Issue in description for Error code field (ERROR Response TTIU)
Rajneesh Kumar
- Issues in Figures on SAS Speed Negotiation Sequence
Pooja Gupta
- Issues in Figures on SAS Speed Negotiation Sequence
Penokie, George
- Issues in Figures on SAS Speed Negotiation Sequence
Pooja Gupta
- Issues in Figures on SAS Speed Negotiation Sequence
Penokie, George
- New SPC-4 Letter Ballot documents
Ralph Weber
- New SPC-4 Letter Ballot documents uploaded
Ralph Weber
- pqi-r07 is available
Ie Njoo
- Recent T10 documents uploaded since 2013/09/01
T10 Document Administrator
- Recent T10 documents uploaded since 2013/09/08
T10 Document Administrator
- Recent T10 documents uploaded since 2013/09/15
T10 Document Administrator
- Recent T10 documents uploaded since 2013/09/22
T10 Document Administrator
- Review of 13-138 SPL-3 Credit Advance
Penokie, George
- SAS PHY teleconference, Thursday, October 10, 2013, 10:00 am CDT
Alvin Cox
- SAS PHY teleconference: Thursday, September 12, 2013, 10:00 am CDT
Alvin Cox
- SBC-3 letter ballot comments relating to 13-213
Penokie, George
- SBC-3 r35j 4.15 text 'xxx medium operation that is not part of an xxx operation' leaves too much to the imagination
Ralph Weber
- SBC-3 r35j 4.15 text 'xxx medium operation that is not part of an xxx operation' leaves too much to the imagination
Elliott, Robert (Server Storage)
- SBC-3r35i/j issue
Knight, Frederick
- SBC-3r35i/j issue
Elliott, Robert (Server Storage)
- SMP REQUEST/SMP RESPONSE timer query
Apoorva Vats
- SMR drive session at Linux Plumbers
Dave B Anderson
- Some items to discuss for your stay in Boston area
Felton, Mickey
- Some items to discuss for your stay in Boston area
Felton, Mickey
- SOP Rev 4e
Curtis Stevens
- SOP Teleconference
Curtis Stevens
- SOP Teleconference
Bill Martin-SSI
- SOP Teleconference
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG
Curtis Stevens
- SOPQI WG & Atomic Write
Curtis Stevens
- SPC-4 LB Resolution
Ralph Weber
- SPC-4 LB Resolution
Ralph Weber
- SPC-4 LB Resolution
Ralph Weber
- T10 letter ballot on forwarding SPL-3
John Lohmeyer
- T10 Reflector clean up
John Lohmeyer
- T10 Reflector Monthly Reminder
T10 List Manager
- T10 Working Draft Assignment: sbc3r35j
Penokie, George
- Typo in latest spec SPL3R04 for Persistent Connections - 1 message with two sources
Penokie, George
- Typo in latest spec SPL3R04 for Persistent Connections - 1 message with two sources
Penokie, George
- VERIFY & how the data got into the cache
Ralph Weber
- VERIFY & how the data got into the cache
Elliott, Robert (Server Storage)
Last message date:
Mon Sep 30 08:57:04 PDT 2013
Archived on: Sun Sep 6 23:29:51 PDT 2015
This archive was generated by
Pipermail 0.09 (Mailman edition).