FW: RE: T10 Working Draft Assignment: spl-r06d

Penokie, George George.Penokie at lsi.com
Tue Jun 1 14:08:55 PDT 2010


Formatted message: <a href="http://www.t10.org/cgi-bin/ac.pl?t=r&f=r1006013_f.htm">HTML-formatted message</a>

Richard,
The new wording you point out is only a reflection of what is already defined
in the state machines. Also, the list is not a list of requirements as there
is no shall, or should. There isn't even a may. It's just a statement of
fact.
If you are going to do that then I would have to add a statement like that to
all the other primitives that is a negative response.
That said, if Seagate wants to submit a late letter ballot comment then you
need to have one of your T10 representatives do so.
Bye for now,
George Penokie
LSI Corporation
3033 41st St. NW
Suite 100
Rochester, MN 55901
507-328-9017
george.penokie at lsi.com
From: owner-t10 at t10.org [mailto:owner-t10 at t10.org] On Behalf Of Richard Bohn
Sent: Tuesday, June 01, 2010 2:41 PM
To: T10 Reflector (t10 at t10.org)
Subject: Re: FW: RE: T10 Working Draft Assignment: spl-r06d
I'm not in favor of the wording of the PS_NAK section (6.2.6.12 PS_NAK) as I
don't think we should strictly limit the reasons for sending PS_NAK as this
new paragraph appears to do.
In my view, devices should have some freedom in determining whether to ACK /
NAK a power condition request once the feature is enabled on a link. The
recipient of the request may have knowledge outside of the specification in
addition to just being in "an attempt to establish a connection" that would
lead it want to NAK a request to balance the power / performance trade-off of
a particular system.
I'd suggest adding the following additional item to the list:
c) a PS_REQ is received and the request is disallowed for a vendor-specific
reason.
Richard Bohn
Office: 952-402-3848
On Tue, Jun 1, 2010 at 1:03 PM, Penokie, George
<George.Penokie at lsi.com> wrote:
* From the T10 Reflector (t10 at t10.org<mailto:t10 at t10.org>), posted by:
* "Penokie, George" <George.Penokie at lsi.com>
*
I have posted a new version of SPL. This version has all changes made as a
result of letter ballot marked with strikeouts and underlines. The changes
|from revision 6c to 6d are indicated by change bars.
For those of you who are interested in the phy power management should look
at:
- The PS_ACK section (6.2.6.11 PS_ACK)
- The PS_NAK section (6.2.6.12 PS_NAK)
- Section 6.11 Entering low phy power condition (Note that there is now a
PS_ACK pattern)
- In the CC and XL state machines the term PS_ACK/Idle Dwords has been
replaced with PS_ACK pattern.
Bye for now,
George Penokie
LSI Corporation
3033 41st St. NW
Suite 100
Rochester, MN 55901
507-328-9017
george.penokie at lsi.com
-----Original Message-----
From: localadmin at scsibbs.lsi.com
[mailto:localadmin at scsibbs.lsi.com] On
Behalf Of T10 Working Draft Administrator
Sent: Tuesday, June 01, 2010 12:00 PM
To: Penokie, George
Cc: John Lohmeyer
Subject: Re: RE: T10 Working Draft Assignment: spl-r06d
2010/06/01 11:00:26
Your request to upload a file or files to the T10 site has been accepted.
Your file will be posted at:
  http://www.t10.org/cgi-bin/ac.pl?t=f&f=spl-r06d.pdf
Source File(s) that will be archived are:
  SPL-r06d.zip will be archived as spl-r06d.zip
Normally, the posting/archiving process takes about 30 minutes.
Please contact John Lohmeyer <lohmeyer at t10.org<mailto:lohmeyer at t10.org>>
should you need further assistance.
"Penokie, George" <George.Penokie at lsi.com>
wrote:
> From: "Penokie, George"
<George.Penokie at lsi.com>
> To: T10 Working Draft Administrator <docs at t10.org<mailto:docs at t10.org>>
> Date: Tue, 1 Jun 2010 10:49:58 -0600
> Subject: RE: T10 Working Draft Assignment: spl-r06d
> Extracted-To: AutoPWD
>
>
>
> Bye for now,
> George Penokie
>
> LSI Corporation
> 3033 41st St. NW
> Suite 100
> Rochester, MN 55901
>
> 507-328-9017
> george.penokie at lsi.com
>
> -----Original Message-----
> From: localadmin at scsibbs.lsi.com
[mailto:localadmin at scsibbs.lsi.com] On
Behalf Of T10 Working Draft Administrator
> Sent: Tuesday, June 01, 2010 11:04 AM
> To: Penokie, George
> Subject: T10 Working Draft Assignment: spl-r06d
>
> 2010/06/01 10:04:27
>
> Your T10 working draft request has been approved and
> the following working draft revision was assigned:
>
>	Project: SPL
> Working Draft: spl-r06d
>   Upload Code: AC_05814sS7fFbnioj
>    Draft_Date: 2010/06/01
>  Draft_Author: George Penokie
>   Draft_Title: SAS Protocol Layer (SPL)
>
> ## Please reply to this email and attach your working draft to
> ## the reply email.  Please attach both the source file and a
> ## PDF file made from your source file.  The source file may be
> ## ZIP'd, but the PDF file must not be ZIP'd.
> ##
> ## Please generate your PDF files for posting to be compatible
> ## with Acrobat 4.0 (PDF 1.3). (This parameter is set in
> ## Distiller, Settings, Job Options, Compatibility.)
> ##
> ## If you cannot create PDF files, your upload will be
> ## forwarded to an administrator.  This will delay your
> ## posting until the administrator can make the PDF file.
> ##
> ## It is strongly recommended that you provide the source file(s).
> ## The source file(s) will be archived in case the PDF file must
> ## be re-created.
> ##
> ## It is critical that your reply email include the above
> ## Upload Code.  Without it, your posting cannot be processed.
> ## The filenames you use are not important as long as the
> ## extensions are correct.
> ##
> ##
> ##  CHANGING YOUR MIND
> ##  ------------------
> ##
> ## If you wish to cancel this working draft, reply to this eamil
> ## without any attachments and edit the following line to change
> ## the word no to yes:
> ##
>    Cancel_Working_Draft: no
> ##
> ##
> ##  EDITING WORKING DRAFT INFORMATION
> ##  ---------------------------------
> ##
> ## If one of the above fields Draft Date, Draft Author, or
> ## Draft Title is no longer accurate, you may edit it as
> ## necessary.
> ##
> ## If you do not want this working draft to be made the current
> ## working draft for your project on the T10 web site, edit the
> ## following line to change the word yes to no:
> ##
>    Set_as_Current_Revision_on_web_site: yes
> ##
> ## Please note that changing the above parameter only affects the
> ## links on the "Draft Standards and Technical Reports" and the
> ## "SCSI-3 Standards Architecture" web pages. This working draft
> ## will still appear in the next mailing.
> ##
> ##  COPYRIGHT POLICY
> ##  ----------------
> ##
> ## Do not post working drafts containing a copyright statement
> ## other than the INCITS copyright statement.
>
> Attachment Converted: "C:\ATTACH\SPL-r06d.zip"
>
> Attachment Converted: "C:\ATTACH\SPL-r06d.pdf"
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to
majordomo at t10.org<mailto:majordomo at t10.org>



More information about the T10 mailing list