abbreviation error in 6.7.4.2.3.4

Matt.Hallberg at lecroy.com Matt.Hallberg at lecroy.com
Mon Aug 13 17:44:25 PDT 2007


* From the T10 Reflector (t10 at t10.org), posted by:
* Matt.Hallberg at lecroy.com
*
Greetings,
Came across an abbreviation in section 6.7.4.2.3.4.
Figure 130 defines the Train-SNW, including:
a) maximum Train-SNW window time (MTT);
b) rate change delay time (RCDT);
c) maximum train time (MTT);
d) train lock time (TLT);
e) actual training time (ATT).
The abbreviation for a) should be  MTWT as per figure 130.
It's something minor, but could lead to temporary confusion :)
Thanks.
Best Regards,
-matt
____________________________________
Matthew Hallberg
PSG Sales Specialist, Storage, US West
LeCroy Corporation
O: 408-727-6600 x 215
**New Cell Phone #*** C: 408-307-2314
F: 408-727-6622
www.lecroy.com
www.getcatalyst.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org



More information about the T10 mailing list