Updated revision of T10/05-446 has been posted to the T10 web site.
Paul Entzel
Paul.Entzel at quantum.com
Tue Jan 17 10:53:49 PST 2006
* From the T10 Reflector (t10 at t10.org), posted by:
* "Paul Entzel" <Paul.Entzel at Quantum.Com>
*
This is a multi-part message in MIME format.
------_=_NextPart_001_01C61B97.5A59C3B8
Content-Type: text/plain;
charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
Revision 2 of the tape encryption proposal (T10/05-446r2) has been
posted to the T10 web site. This revision includes almost all of the
suggested changes from the working group meeting last week. The only
suggestion I passed on was the one to combine 2 tables that were similar
into one. None of the suggestions proposed via email the last couple of
days have been included in this revision. I talked with Dwayne Edling
this morning and he plans to have a proposal ready before the conference
call next week. If IBM has any changes they would like to proposed we
can discuss those next week also. If anyone would like a copy of the
proposal with change bars, please email me and I will gladly provide
one.
As I mentioned at the working group meeting, this revision still uses
the new commands. I will begin work immediately on revision 3 which
will replace the new commands in the proposal with the SECURITY PROTOCOL
IN and SECURITY PROTOCOL OUT commands approved into SPC-4 last week. No
other changes are planned for revision 3.
Paul Entzel
Quantum
------_=_NextPart_001_01C61B97.5A59C3B8
Content-Type: text/html;
charset="us-ascii"
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
Updated revision of T10/05-446 has been posted to the T10 web = site. Revision 2 of the tape encryption proposal (T10/05-446r2) has been posted to the T10 web = site. This revision includes almost all of the suggested changes = from the working group meeting last week. The only suggestion I passed on was the one to combine 2 = tables that were similar into one. None of the suggestions proposed via email the last = couple of days have been included in this revision. I talked with Dwayne Edling this morning and he plans to = have a proposal ready before the conference call next week. If IBM has any changes they = would like to proposed we can discuss those next week = also. If anyone would like = a copy of the proposal with change bars, please email me and I will = gladly provide one. As I = mentioned at the working group meeting, this revision still uses the new = commands. I will begin work = immediately on revision 3 which will replace the new commands in the proposal with = the SECURITY PROTOCOL IN and SECURITY PROTOCOL OUT = commands approved into SPC-4 last = week. No other changes are = planned for revision 3. Paul = Entzel Quantum
------_=_NextPart_001_01C61B97.5A59C3B8--
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list