SAS-2 6 Gbps phy WG meeting May 25/26
Elliott, Robert (Server Storage)
elliott at hp.com
Tue Apr 26 15:45:14 PDT 2005
* From the T10 Reflector (t10 at t10.org), posted by:
* "Elliott, Robert (Server Storage)" <elliott at hp.com>
*
Here is the meeting information for the SAS-2 6 Gbps meeting on Wed/Thu
25-26 May 2005 (9am-5pm each day).
Hilton Garden Inn
7979 Willow Chase Boulevard, Houston, Texas, United States 77070
Tel: 1-832-912-1000 Fax: 1-832-912-1025
Tel: 1-877-STAYHGI (1-877-782-9444)
http://www.houstonnorthwest.gardeninn.com
Group Name: HP T10 Ad Hoc 6G
Room: Single Rate: Double Rate:
King Bed Room $99.00 $99.00
Reservation Cut off Date: May 18, 2005
Reservation Method: Individual Call-in
Extra Person Charge: $10.00
All reservations must be guaranteed to a credit card or to company (if
approved for billing). Those reservations not canceled by 6:00PM (24
hours prior to arrival) will be billed accordingly.
--
Rob Elliott, elliott at hp.com
Hewlett-Packard Industry Standard Server Storage Advanced Technology
https://ecardfile.com/id/RobElliott
> -----Original Message-----
> From: owner-t10 at t10.org [mailto:owner-t10 at t10.org] On Behalf
> Of Elliott, Robert (Server Storage)
> Sent: Friday, April 15, 2005 12:21 AM
> To: t10 at t10.org
> Subject: SAS-2 6 Gbps phy WG meeting May 25/26
>
> * From the T10 Reflector (t10 at t10.org), posted by:
> * "Elliott, Robert (Server Storage)" <elliott at hp.com>
> *
> Since T10 week will be occupied by SAS-1.1 letter ballot comment
> resolution, HP is proposing that T10 hold a 6 Gbps SAS-2 physical WG
> meeting on Wed/Thu 25-26 May in Houston, TX. This will not be
> officially T10 sanctioned until the T10 plenary on 5 May.
>
> Below is my suggestion for the agenda; the actual agenda will
> depend on
> what people volunteer to present. Please let
> Alvin.Cox at seagate.com and
> me know if you are willing to present on any specific topic
> (it doesn't
> have to be on this list).
>
>
> Day 1 (Wednesday 25 May 2005) 9:00am-6:00pm
> Survey of other standards - what techniques have they
> chosen/considered/rejected
> Backplane focused:
> * OIF CEI-6G-LR (6 Gbps)
> * OIF CEI-11G-LR (11 Gbps)
> * IEEE 802.3ap Backplane Ethernet task force (10 Gbps)
> Backplane and cable focused:
> * Fibre Channel FC-PI-4 (8 Gbps)
> Cable focused:
> * IEEE 802.3ab Gigabit Ethernet over Cat-5 (1000BASE-T)
> * IEEE 802.3an 10 Gigabit Ethernet over Cat-5e/6 (10GBASE-T)
>
> Tutorials
> * StatEye simulation tool
> * Decision Feedback Equalizer (DFE) concept and techniques
>
> Day 2 (Thursday 26 May 2005) 9:00am-6:00pm
> Description of test chips that have been publicly demonstrated (e.g. 6
> Gbps OIF CEI-6G test chips)
>
> Test results of using those test chips (and/or test equipment
> simulating
> at 6 Gbps) on real SAS interconnects
> * InfiniBand style external cables (0 - 6 m)
> * Molex iPASS external/internal cables (0 - 6 m)
> * Internal cables and backplanes
>
> Test equipment/procedures for 6 Gbps
>
> Discuss what should be done for SAS-2
> * Infrastructure requirements (cable lengths, backplane trace
> length/complexity, etc.)
> * Signaling techniques (what transmit and/or receiver
> processing, can we
> rule out multilevel signaling, moving from 8b10b, etc.)
> * Specification techniques (StatEye?)
> * SATA compatibility at 6 Gbps
>
> Discuss plugfest possibilities (phy layer interop testing before
> committing to ASICs?)
> Discuss schedule for SAS-2
>
>
> ---
> Rob Elliott, HP Server Storage
> elliott at hp.com
>
> *
> * For T10 Reflector information, send a message with
> * 'info t10' (no quotes) in the message body to majordomo at t10.org
>
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list