Draft minutes of Serial Attached SCSI PHY Study Group Conference callMonday, July 8, 2002
Alvin.Cox at seagate.com
Alvin.Cox at seagate.com
Tue Jul 9 14:42:37 PDT 2002
* From the T10 Reflector (t10 at t10.org), posted by:
* Alvin.Cox at seagate.com
*
To: T10 Membership
From: Alvin Cox
Subject: Serial Attached SCSI PHY Study Group Conference call Monday, July
8, 2002 2:00 pm ? 4:00 pm CDT
Meeting was called to order at 2:05 pm CDT, Monday, July 8, 2002
Attendees:
Richard McMillan Adaptec, Inc.
Ken Paist Agere Systems
Barry Olawsky HP
Lou Fasano IBM
Farzad Ghobadian Intel Corp.
Mike Jenkins LSI Logic
Russ Brown Maxtor Corp.
Juzer Mogri NEC Electronics
Alvin Cox Seagate
Allen Kramer Seagate
Joni Clark Seagate
Mike Jenson ST Microelectronics
12 people present.
Agenda:
1. Table 19 update (Brown)
Excess differential input capacitance specification issue:
Make reference to the time number instead of capacitance and
update note f.
1.5 Gbps 150 ps max
3.0 Gbps 100 ps max
02-210r2 was recommended to T10 for inclusion in SAS, 7 YES / 0 NO / 3
ABSTAIN
2. Test load (Jenkins)
Review proposal T10 document 02-240r0
Significant discussion on this item. Mike Jenkins will update the
drawing to specify 1.5 and 3.0 GHz and scale the numbers accordingly.
Decided to use the same equation and thus the same test vehicle as
XAUI. Mentioned that the sample in the figure was worse than 4dB. It
is not certain whether the values match the near end and far end
values specified in the existing SAS tables. Mike to update so that
the topic can be reviewed during the T10 meeting next week. Since Mike
will not be present, a teleconference has been scheduled for this
topic on 7/22 (see below).
3a. OOB speed negotiation
Review proposal T10 document 02-198r4
See item 3b. Additional review during face-to-face.
3b. Loop Lock time (Brown)
New item. Need information posted.
Information was posted to the reflector and discussed during the call.
Determined to be part of the OOB speed negotiation topic. IC suppliers
concerned about lock time allowances during speed negotiation. FCAL
allows approximately 500us and would be beneficial for design latitude
in SAS, especially since speed negotiation is not often performed.
Recommended that the protocol group consider the FCAL timing for the
RCD interval.
4. Jitter tolerance compliance points table review (Jenkins/Kramer)
Status of review.
Jenkins and Kramer to review and Kramer will present durig
face-to-face.
5. Common Mode Shift Oxide Stress (Cable)
Review proposal T10 document 02-247r0
Not covered. Review during face-to-face.
6. 3.3V LED driver characteristics
Not covered. Review during face-to-face.
07/22/02 TELECONFERENCE INFORMATION:
* Start Date/Time: 07/22/02 MON 02:00 PM CDT
* End Date/Time: 07/22/02 MON 04:00 PM CDT
PARTICIPANT INFORMATION:
All Participants should use the following information to reach the
conference call:
* PARTICIPANT CODE: 734444
* Toll Free Dial In Number: (888)296-1938
Webex information:
Meeting Name: SAS PHY WG
Scheduled Time: 7/22/2002 at 1:45PM (GMT -05:00) Central Time, USA &
Canada (DayLight Time).
Meeting Number: 281652669
Any meeting attendee can use this number to join the meeting, at
https://seagate.webex.com/join/
Password: SASphy
T10 Face-to-face July
See above for agenda items.
Monday-Tuesday, July 15-16, 2002 commencing at 1:00 p.m. on Monday and
ending at 5:00 pm on Tuesday in Colorado Springs, CO at the Wyndham
Colorado Springs Hotel (719-260-1800).
The meeting notice (with a link to make reservations on-line) is
available at:
http://www.t10.org/ftp/t10/announce/ann-m050.pdf
The meeting was adjourned at 4:00 pm CDT, Monday, July 8, 2002
Alvin Cox
Seagate Technology, LLC
405-324-3413
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list