Transmit assertion/negation period
Bill Galloway
BillG at breatech.com
Thu May 3 10:57:12 PDT 2001
* From the T10 Reflector (t10 at t10.org), posted by:
* "Bill Galloway" <BillG at breatech.com>
*
Bill Petty brought up a concern about the Transmit assertion and negation
period for Fast-160 in SPI-4. He was concerned that the times could not
be met with legal slew-rates. Since the time is measured from zero crossing
to zero crossing, I do not believe that slew rate matters.
I still think that PLL jitter may have been left out but not slew rate.
Bill do you agree???????
Bill Galloway
BREA Technologies, Inc.
P: (281) 530-3063
F: (281) 988-0358
BillG at breatech.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list