SSM reminder agenda for Next weeks meeting
Aloisi, Paul
paul_aloisi at ti.com
Tue Dec 4 11:08:47 PST 2001
* From the T10 Reflector (t10 at t10.org), posted by:
* "Aloisi, Paul" <paul_aloisi at ti.com>
*
AGENDA SSM MEETING Guadalajara
December 12-13, 2001 1:30PM to 6 PM 12/12; 9AM to 6PM 12/13 Guadalajara, MX
(JPM)
1. AGENDA SSM MEETING
2. Introductions
3. Attendance
4. Agenda development
5. Approval of previous minutes
6. Action item review
7. Administrative structure
8. Presentation Policy
10. Presentations
10.1 Carry over presentations
10.1.1 Cable extraction data, Jie Fan, Umesh, Madison/Seagate
10.1.1.1 Single pair data extraction from electrical measurements on round
shielded cable, Jie Fan
10.1.1.2 Multiline data extraction from electrical measurements, Umesh
10.1.1.3 Parameter extraction for transition region models, Bob Gannon
10.1.1.4 Parameter extraction from physical description of twist and flat
constructions, Greg Vaupotic, Amphenol Spectra Strip
10.1.2 Periodic Structures in transmission lines, Larry Barnes, LSI Logic
10.1.3 IBIS presentations, Larry Barnes, LSILogic
10.1.4 Parameter extraction for transition region models, Bob Gannon
10.1.5 Models for instrumentation interfaces status, Jason Chou
10.1.6 Backplane presentation, Bruce Manildi
10.2 New presentations
10.2.1
10.3 Basic system model, Bill Troop IBM
10.4 SSM-2 Document review -
10.4.1 SSM
11. Matrix development for SSM-2
11.1 Overview section: owner, Bill Ham
11.2 Transceiver chips: owner, Larry Barnes
11.3 Bus segment termination: owner, Paul Aloisi / Don Getty
11.4 Host bus adapter (transceiver board): owners, (Need new owner)
11.5 Mated connectors: owner, Martin Ogbuokiri, Steve Wong
11.6 Transition regions: owners, Bob Gannon, Jason Chou
11.7 Bulk cable: owner, Jie Fan, Zane Daggett, Greg Vaupotic
11.8 Backplane: owner, Larry Barnes, Bruce Manildi
11.9 Cable assemblies, owner Jason Chou (Lead), Bob Gannon, Steve Wong
backup
11.10 How to develop IBIS model section 6.2.1, Barnes
12. Simulation integration strategy
12.1 System configurations - Topology, Bruce Manildi
12.2 Data patterns, Bill Ham, Bruce Manildi
12.3 Data rate - group - Ultra640 & Ultra1280 additions
13. Tools:
14. New business
15. Status of models supplied to the T10 web site
16. Next meetings
Feb 19-20, 2002 9AM to 5 PM both days, 2/19 editing, 2/20 SSM working group,
Santa Cruz, CA (Seagate)
April 2 PIP, April 3 SSM New Hampshire - Hitachi Cable
17. Action Items:
17.1 Action items from previous meetings
17.2 New action items from present meeting
18. Adjourn
Address, FAX and Phone numbers changed 23-July-2001
Paul D. Aloisi Phone: 603-222-8687
Texas Instruments Mobile:603-930-4104
50 Phillippe Cote St FAX: 603-222-8700
Manchester, NH 03101 email: paul_aloisi at ti.com
web site: www.ti.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list