Sorry, I had the wrong start time for the STA Technical meeting, SCSI Harbor
Aloisi, Paul
aloisi at unitrode.com
Tue Feb 23 14:45:08 PST 1999
* From the T10 Reflector (t10 at symbios.com), posted by:
* "Aloisi, Paul" <aloisi at unitrode.com>
*
STA Technical Agenda -- SCSI Harbor
March 11, 1999 - Harrisburg, PA
The STA Technical meeting/SCSI Harbor meeting will start 30 minutes after
the Plenary but not before 2:30PM.
Agenda
1. Opening Remarks and Introductions
2. Approval of Agenda
3. Attendance and Membership
4. Approval of Minutes - January 28,1999 Seaside, CA (99s001r0)
5. Document Distribution www.scsita.org/harbor
6. Review of Old Action Items
6.1 Tom Winsemius will complete the open issues in sections
2.6 (EMI), 2.10 (Shock and Vibration), 2.11 (Thermal Management) and 6.0
(Handling, ref IDEMA). (Carry over).
6.2 Pat McGarrah will edit sections 1.1 through 1.3. (Carry
over).
6.3 Pat McGarrah will provide prototype wrappers to other
drive vendors for thermal testing. (Carry over)
6.4 The other drive vendors will do thermal testing present
results and anticipated future needs.
6.5 A SCA-2 backplane is needed for testing the shock and
vibration.
7. Document Review [Benjie Sun] (9xs00xRx)
8. Old Business
8.1 Testing Strategy [Ham]
9. New Business
10. Review of Action Items
11. Meeting Schedule
May 6, 1998 in Manchester, NH
12. Adjournment
Paul D. Aloisi
Unitrode MS:84 Phone: 603-429-8687
7 Continental Blvd FAX: 603-429-8963
Merrmimack, NH 03054 email: aloisi at unitrode.com
Website:
www.unitrode.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at symbios.com
More information about the T10
mailing list