Updated meeting map for March 8-12

John Lohmeyer lohmeyer at ix.netcom.com
Tue Feb 23 13:42:41 PST 1999


* From the T10 Reflector (t10 at symbios.com), posted by:
* John Lohmeyer <lohmeyer at ix.netcom.com>
*
The Cable Performance meeting on Monday morning has been canceled (in favor
of the March 2nd meeting in Manchester).  A report on the 3/2 meeting will
be given at the SPI-3 WG meeting on Tuesday.  Also FYI, I understand that
the Mt. Fuji group plans to meet on Monday and then have a joint meeting
with the MMC-2 group on Tuesday.  -- John


                                March '99 Meeting Map
                                  (2/23/99 Version)

Monday 3/8         9   10  11  12  1   2   3   4   5   6   7   8   9
                   +===============================+---------------+
> no FC multispeed |///////////////|Domain Validation //////////// |  (25)
> no Cable Perf mtg+===============================+---------------+
                   | T11.3 FC-AL-3 / FC-AL-2                       |  (40)
                   +-----------------------------------------------+

Tuesday 3/9        9   10  11  12  1   2   3   4   5   6   7   8   9
                   +===================================+     
                   | SPI-3 WG                          |              (50)
                   +===================================+
                   | MMC-2 WG                          |              (15)
                   +===================================+
                   | RBC WG                            |              (15)
                   +===============+===================+===========+
> added FCP-2      | FC-AL-2       | FC-Tape/FCP-2 WG              |  (40)
                   +---------------+===============================+

Wednesday 3/10     9   10  11  12  1   2   3   4   5   6   7   8   9
                   +=======================================+
                   | SCSI WG   (includes joint MMC-2 mtg)  |          (50)

                   +===================================+===+
                   | MMC-2 WG                          |              (15)
                   +===============+===============+===+===+
                                   | SFF SSWGs     | SFF   |          (40)
                                   +---------------+-------+

Thursday 3/11      9   10  11  12  1   2   3   4   5   6   7   8
                   +=====================+-----------------+
                   | T10 Plenary         / SCSI Harbor (*) |          (60/40)
                   +===========+========+------+-----------+
                               | STA Marcom    |                      (15)
                               +---------------+
 (*) - SCSI Harbor meeting begins 30 minutes after T10 plenary
       but not before 2:30 pm

Friday 3/12    8   9   10  11  12  1   2   3   4   5
                 +---------------------------------+
                 | SCSI Trade Association (STA)    |                  (30)
                 +---------------------------------+

    Meetings marked with == are T10-authorized meetings.
    Meetings marked with -- are authorized by other groups and may change
    without notice.

Other T10-authorized meetings:
Meeting        Date                Location / Contact
-------------  ------------------  --------------------------------------
T10/T11.3      12/15/98   Tue      Tucson, AZ / T11
Joint Tape WG
Cable Perf.    12/2/98    Wed      Manchester, NH / Zane Daggett
MMC-2 WG       11/30-12/2 Mon-Wed  Irvine, CA / Ron Roberts
MMC-2 WG       1/25-27/99 Mon-Wed  Monterey, CA / Larry Lamers
SPI-3 WG       1/26-27/99 Tue-Wed  Monterey, CA / Larry Lamers
SPC-2 WG       1/28/99    Thu      Monterey, CA / Larry Lamers


 Meeting Map Abbreviation Key:
Amnd:        Amendment
CAM:         Common Access Method
CAM-3:       Next generation CAM for SCSI-3
EPI:         SCSI Enhanced Parallel Interface (Technical Report)
Encl Profile Enclosure Profile Study Group
Fast-20:     Data Transfer at 20 Mega-transfers/second (a.k.a., Ultra)
Fast-40:     Data Transfer at 40 Mega-transfers/second (a.k.a., Ultra2)
Fast-80:     Data Transfer at 80 Mega-transfers/second (a.k.a., Ultra3)
FC:          Fibre Channel
FC-AL:       Fibre Channel - Arbitrated Loop (a T11 project)
FCLC:        Fibre Channel Loop Community (not an NCITS activity)
I/F:         Interface
HAP:         High Availability Profile (Technical Report)
LB:          Letter Ballot
MMC-2:       Multimedia Commands - 2 (CD-ROM, DVD, etc.)
PH:          Physical (Connectors, Cables, Transceivers, etc.)
Plenary:     Full Committee Meeting

RAID:        Redundant Array of Independent Devices
RBC:         Reduced Block Commands
SBC:         SCSI-3 Block Commands
SBP-2:       Serial Bus Protocol for IEEE 1394 (2nd generation protocol)
SCC-2:       SCSI Controller Commands - 2 (2nd generation RAID command set)
SCSI:        Small Computer System Interface
SES:         SCSI Enclosure Services
SCSI Harbor: A STA project on defining a wrapper for SCSI devices
SFF:         SFF Industry Group (not an NCITS activity)
SG:          Study Group
SMC:         SCSI-3 Medium Changer Commands
SPC-2:       SCSI Primary Commands - 2 (2nd generation)
SPI-2:       Second Generation SCSI Parallel Interface
SPI-3:       Third Generation SCSI Parallel Interface
SSA:         Serial Storage Interface
SSC:         SCSI-3 Stream Commands (includes Tape)
SSWGs:       Specific-Subject Working Groups
STA:         SCSI Trade Association (not an NCITS activity)
STA Tech:    STA Technical Meeting (T10 members invited)
T10:         Lower Level Interfaces Technical Committee
WG:          Working Group (same as Ad Hoc Group)


--
John Lohmeyer                  Email: lohmeyer at ix.netcom.com
LSI Logic Corp.                Voice: +1-719-533-7560
4420 ArrowsWest Dr.              Fax: +1-719-533-7036
Colo Spgs, CO 80907              BBS: +1-719-533-7950

*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at symbios.com





More information about the T10 mailing list