Revised Draft Agenda for SPI-3 Physical Study Group

Lawrence Lamers lawrence_lamers at corp.adaptec.com
Fri Jan 16 15:28:04 PST 1998


* From the T10 (formerly SCSI) Reflector (t10 at symbios.com), posted by:
* "Lawrence Lamers" <lawrence_lamers at corp.adaptec.com>
*
This agenda revision is to clarify item 5.3.  There are no protocol
discussions planned for this meeting.


Draft Agenda
Fast-xx Study Group
January 21, 1997=A0 Newport Beach, CA


1. Opening Remarks
2. Approval of Agenda
3. Attendance and Membership
4. Old Business
4.1 Low attenuation cables [Rogers, Bellino]
4.2 Staged contact resistance [AMP]
4.3 Bias reduction proposal [Bridgewater]
4.4 Dual clocking proposal [Bastiani]

5. New Business
5.1 Initial test results on dual clock signals [Bastiani]
5.2 Discussion on using eye pattern for specification [Bastiani]
5.3 Need for error detection on dual-edge clocks [Gintz]
5.4 Hot plugging concerns [Gintz]

6. Meeting Schedule
7. Adjournment


Regards,

Lawrence J. Lamers
Adaptec, Inc
691 South Milpitas Blvd.
Milpitas, CA   95035
(408) 957-7817
ljlamers at corp.adaptec.com

*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at symbios.com




More information about the T10 mailing list