* Louis Grantham <Louis.Grantham at dalsemi.com>
*
Minutes should be corrected
4.8 SPI-2 Document Review
>>>
Term power - LVD should interoperate with single-ended.
May operate down to 3.0 volts, open system requires 4.0
volts. Change in philosophy from what is sourced to what is
delivered to terminator. Needs to be reviewed for next
meeting. Allows use of term power for other than
terminators. Proposed 1000 mA for two LVD terminators at 3
volts.
>>>
3.0 volts and 1000 mA were agreed to at the meeting for
revision 8.