ATA Project Transfer to X3T13
Gene Milligan
Gene_Milligan at notes.seagate.com
Sat Dec 16 17:15:46 PST 1995
* From the SCSI Reflector, posted by:
* <Gene Milligan <Gene_Milligan at notes.seagate.com>>
The notice below was posted to the ATA reflector along with other relevent
messages and documents. It is intended that ATA related items no longer take up
space on this X3T10 reflector. A notable exception is that it is my intention,
assuming John Lohmeyer's agreement that X3T13 liaison reports will be posted on
this reflector following the X3T13 plenary.
Accredited Standards Committee
X3, Information Technology*
Document Number: X3T13/96-001
Project: Various AT Attachment
Reference Document: N/A
Date: 12/16/95
Reply to: Gene E. Milligan
Seagate Technology
OKM 251
10323 West Reno (West Dock)
P.O. Box 12313
Oklahoma City, OK 73157-2313
(405) 324-3070 FAX: 324-3794
gene_milligan at notes.seagate.com
TO: X3T13 Technical Committee Potential Participants
SJ: X3T13 MEETING NOTICE January 1996
The organizational plenary meeting of X3T13 will be held January 23-26, 1996
beginning at 0900 in the Crown Sterling Suites, in Milpitas, California, hosted
by Quantum.
X3T13s scope includes all of the interface standards projects relating to the
connection
model described as AT Attachment. At the moment these include ATA, ATA-2,
ATA-3, and ATAPI.
A new project authorization titled ATA + PI is currently being balloted by X3
and will be on the
agenda. All of the current AT Attachment activity has been transferred from
X3T10 which will now
focus all their attention on interface standards projects relating to the
connection model described as
SCSI.
Individuals from organizations with a material interest and expertise (self
proclaimed - no tests
are given) in the AT Attachment connection model are eligible to become members
of X3T13 at the
second plenary meeting they have attended out of three successive X3T13 plenary
meetings. There
can be only one principal member from an organization. The meetings however,
are open to all
attendees practicing proper decorum. The organizational plenary meeting waives
on a one time
only basis the requirement to attend the second meeting to become a member.
Regular
attendance at plenary meetings, responding to letter ballots, and paying fees
invoiced by X3 are
required to maintain membership. The fees will be discussed at the
organizational meeting but in
general consist of a membership fee (for principal members, some alternates,
and official observers);
an international support fee for those committees that have any international
standards projects; and a
subscription fee for those that subscribe to the mailing. The total will depend
upon the estimated
mailings but will likely range between $800 and $1200 for 1996. No fees will be
charged at the
meeting.
Regards,
G.E. Milligan
X3T13 Acting
Chair
Attachments:
X3T12 Agenda
*Operating under the procedures of The American National Standards Institute.
X3 Secretariat: Information Technology Industries Council (ITI)
1250 Eye Street, N.W., Suite 200, Washington, DC 20005-3922; Fax: (202)
638-4922 Tel: (202) 737-8888
Accredited Standards Committee*
X3, Information Technology
Organizational Meeting of X3T13
Preliminary Agenda
1/23-26/96
See Hosts (McGrath) Notice for Hotel Information & Meeting Location
1. Opening Remarks.
2. Approval of Agenda.
3. Attendance and Membership.
4. Document Distribution
5. Overview of X3 and JTC 1 TAG Organization, Policies, Procedures, and Fees
[Barra]
6. Review of Action Items
7. ATA Working Group Report [Milligan]
6. ATA-2 - Project 0948 X3 [Lamers] (X3.279-199x, ATA-2) Status
7. ATAPI - Project 1120D
7.1 ATAPI Working Draft Review [Hanan]
7.2 Other ATAPI Items [] ()
8. ATA-3 - Project 2008D
8.1 ATA-3 X3T10 Letter Ballot Results and Response to Comments (if any)
9 ATA+PI X3 Letter Ballot Results and Response to Comments (if any)
9.1 Strong Command Overlap and Command Queuing Update [McLean]
9.2 Proxy interrupt glitch [Evans]
11. Old Business
11.1 IDENTIFY DRIVE data in support of host requirements [D96107r0] (Stevens)
11.2 Items from the Open Issues List [] ()
11.3 ATA Mode X Analog Issues [] ()
11.4 ATA Cable Issues and Definitions [McGrath] ()
11.5 Cache Flush [Schnell]
12. New Business
12.1 X3T13 Reflector, ftp, and Web site setup [Hanan]
12.2 X3T13 Policies and Procedures to Augment the X3 SD-2
12.2.1 Documentation Procedures [McLean]
12.2.2 Procedures for Preparing Documents for Committee Mailings [Lamers]
12.2.3 Electronic Notification Procedure [Lamers]
12.2.4 Procedure for Funding X3T13 Technical Editors [Lamers]
12.2.5 Procedure for Attendance Interpretation [Milligan]
12.2.6 Operational Policies and Procedures Tailored to X3T13 [Milligan]
13. ISO
13.1 AT Attachment ISO History and Status
13.1 X3T13 ISO Strategy & Resultant Business
14. Call for Patents
15. Open Issues List Summary
16. Action Items
17. Future Meeting Schedule.
18. Adjournment
*Operating under the procedures of The American National Standards Institute.
X3 Secretariat: Information Technology Industries Council (ITI)
1250 Eye Street, N.W., Suite 200, Washington, DC 20005-3922; Fax: (202)
638-4922 Tel: (202) 737-8888
More information about the T10
mailing list