Search T10 Reflector

Please enter search information below. The less data you enter, the more reflector messages will match. If you enter data in a field, then that data must exactly match some portion of the corresponding field in a matching message. AND conditions are separated by a + character. To search for messages containing both the words "SAS" and "OOB" in the email subject, use: SAS + OOB
Search Specification
Email Subject
Case Sensitive
Author's email address
Case Sensitive
Email dates Oldest
Newest
Leave the Newest and Oldest fields blank to search all emails or enter yyyy/mm/dd in these fields to restrict the date range.
Emails Maximum number of messages to display at a time.


Search Results
Email Date Subject Author's Email Address
1999/07/08 FC-TAPE Connector proposal stewart_wyatt@am.exch.hp.com
1999/07/08 [Fwd: Joint T10/T11 Tape WG Draft Agenda] dale_lafollette@stortek.com
1999/07/07 Re: cam_resid calculation smart@zk3.dec.com
1999/07/07 Cable Performance Review Study Group zdaggett@hcm.hitachi.com
1999/07/07 Message to reflector jfan@amp.com
1999/07/06 Joint T10/T11 Tape WG Draft Agenda dale_lafollette@stortek.com
1999/07/06 RE: SPI-3 single-ended AC test circuit Gene_Milligan@notes.seagate.com
1999/07/06 RE 2: SPI-3 single-ended AC test circuit Gene_Milligan@notes.seagate.com
1999/07/06 MMC July Agenda RKROBERTS@aol.com
1999/07/06 Hello, World! lohmeyer@ix.netcom.com
1999/07/06 Re: Voting results on SSC forwarding letter ballot lohmeyer@ix.netcom.com
1999/07/06 Voting results on SSC forwarding letter ballot lohmeyer@ix.netcom.com
1999/07/06 RE: Process Associator in FCP? Trial balloon: Let's drop it. Carl.Zeitler@COMPAQ.com
1999/07/06 ASC/ASCQ 5Dh and SMART disk drives Robert.Elliott@COMPAQ.com
1999/07/06 Handling excess data for READ DEFECT LIST(10)/MODE SENSE(6) Robert.Elliott@COMPAQ.com
1999/07/06 Re: 99-207r0 -- SAM-2 Changes For Queuing ralphoweber@csi.com
1999/07/06 Re: 99-207r0 -- SAM-2 Changes For Queuing dap@nsg0.network.com
1999/07/06 cam_resid calculation groudier@club-internet.fr
1999/07/06 99-207r0 -- SAM-2 Changes For Queuing ralphoweber@csi.com
1999/07/02 Re: SCSI-1... lohmeyer@ix.netcom.com
1999/07/02 SCSI-1... bradshat@iomega.com
1999/07/01 FC-TAPE action items stewart_wyatt@am.exch.hp.com
1999/06/29 RE: SPI-3 single-ended AC test circuit BillG@breatech.com
1999/06/29 RE: SPI-3 single-ended AC test circuit wally@eng.adaptec.com
1999/06/29 RE: SPI-3 single-ended AC test circuit k-gingerich@ti.com
1999/06/29 RE: SPI-3 single-ended AC test circuit sstefek@lsil.com
1999/06/29 Re: SPI-3 single-ended AC test circuit Gene_Milligan@notes.seagate.com
1999/06/29 Incorrect LINK bit location in SAM-2 R10 ralphoweber@csi.com
1999/06/25 Re: SPI-3 single-ended AC test circuit wally@eng.adaptec.com
1999/06/25 MEETING ANNOUNCEMENT: Cable Performance Review Study Group/SCSI SIGNAL MODELING d_wallace@qlc.com
(More)

[Return to the page.]