[T10] Question on wording of sanitize operation behiavior

Ballard, Curtis C (HPE Storage) curtis.ballard at hpe.com
Fri Sep 8 12:30:02 PDT 2017


Gerry,

There was some discussion along these lines during the development of that text.

“power on” versus “unexpected power loss”:  A “power on” is a condition defined in SAM but there is no definition in SAM, SPC, or SBC for “unexpected power loss”.  Every SCSI device that is power cycled ends up in the “power on” condition.  For many SCSI devices the power on condition is the first time the SCSI device is able to detect that a power cycle occurred.  The sanitize operation doesn’t make much progress while the power is off but sometimes the SCSI device doesn’t get to actually suspend the sanitize operation until the power on condition occurs.

Regarding resuming the sanitize, it does seem like there is a possibility that could be more clear but the “power on” condition is clearly defined in SAM as a condition which “shall” cause a hard reset and the hard reset is defined as “shall” cause a logical unit reset so the rules documented in SAM take you to a condition that causes the sanitize to resume processing.  That is the sequence that is expected and documented in both text and diagrams in SAM.  At power on:

1)      The power on condition occurs which causes;

2)      The hard reset condition which causes;

3)      The logical unit reset condition which is specified as a condition after which the sanitize operation is resumed

Curtis

From: t10-bounces at t10.org [mailto:t10-bounces at t10.org] On Behalf Of Gerry Houlder
Sent: Friday, September 8, 2017 9:38 AM
To: T10 Reflector <t10 at t10.org>
Subject: [T10] Question on wording of sanitize operation behiavior

 A question has come up about the rule for resuming sanitize operation after a power on. This is text from SBC-4 clause 4.11:

While performing a sanitize operation, the device server shall:
   :
   :
   c) suspend the sanitize operation while processing the following conditions (see SAM-5):
      A) a power on;
      B) a hard reset;
      C) a logical unit reset; or
      D) a power loss expected;
   d) not suspend the sanitize operation while processing an I_T nexus loss;
   e) resume performing the sanitize operation after processing:
      A) a logical unit reset; or
      B) a power loss expected condition in which no power loss occurs within constraints defined by the applicable SCSI transport protocol standard (e.g., power loss timeout in SPL-3);
   :
   :
First question: Item c) in cludes "power on" as something that cuases sanitize to be suspended, but it seems unreasonable that a sanitize could be in process while power is off. Should this be replaced with "unexpected power loss"?.

Second question: Item e) lists the two items after which sanitize is resumed. Shouldn't this include "power on" as an event to resume from? I think it is too subtle for everyone to understand that a power on always generates a logical unit reset as part of the power on event. Note that we have separate Unit Attention events for "power on reset occurred", "SCSI bus reset occurred", and "bus device reset function occurred". A casual reader could presume that only when "bus device reset function occurred" is reported that the sanitize operation should resume, but this is not what we have intended during our T10 committee discussions.
-------------- next part --------------