Workload Utilization proposals upload

Ralph Weber Ralph.Weber at wdc.com
Fri Mar 7 15:12:25 PST 2014


Formatted message: <a href="http://www.t10.org/cgi-bin/ac.pl?t=r&f=r1403072_f.htm">HTML-formatted message</a>

Even as this missive is winging its way through the Ether(net), two SBC-4
proposals are being added to the CAP agenda. This dynamic duo represents SCSI
clones (as nearly as can be done) of the workload utilization tools already
approved for inclusion in ACS-4.
  *   14-075r0 -- SBC-4: Designed Utilization VPD data
http://www.t10.org/cgi-bin/ac.pl?t=d&f=14-075r0.pdf
  *   14-076r0 -- SBC-4: Workload Utilization logging
http://www.t10.org/cgi-bin/ac.pl?t=d&f=14-076r0.pdf
That neither of these postings meet the Two-Week rule (and the implications
thereof) should be obvious to all, and the author is certainly aware of it.
All the best,
.Ralph