EE Times story re: the Standards Process

Brian A. Berg bberg at bswd.com
Fri Dec 11 11:44:14 PST 2009


* From the T10 Reflector (t10 at t10.org), posted by:
* "Brian A. Berg" <bberg at bswd.com>
*
Of some interest.
Demystifying the standards development process
 
http://www.eetimes.com/showArticle.jhtml;jsessionid=P44IQFVSDPDLRQE1GHPSKHWAT
MY32JVN?articleID=222001705&pgno=2
The process of creating a standard is only one piece of a larger life cycle
that spans from prestandardization investigation and planning through
post-publication activities, including testing, promotion, education and
maintenance.
___________________________________________________________________
  Brian A. Berg 	   bberg at bswd.com     Voice: +1.408.741.5010
  Berg Software Design				FAX: +1.408.741.5234
  14500 Big Basin Way, Suite F	      Consulting: USB/Flash/SCSI/SAN
  Saratoga, CA 95070 USA		       Cell: +1.408.568.2505
			visit the Storage Cornucopia at www.bswd.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org



More information about the T10 mailing list