The teleconference was held from 10:00 a.m. to 1:07 p.m. CDT. The following
people were present for part or all of the call:
Name S Organization Electronic Mail Address
---------------------- -- ------------------------- -------------------------
Mr. Bill Galloway P BREA Technologies, Inc. billg at breatech.com
Mr. Lafe Moon V Data Transit Corp. lafe at data-transit.com
Mr. Rob Elliott P Hewlett Packard Co. Elliott at hp.com
Mr. Thomas Grieff V Hewlett Packard Co. Thomas.Grieff at hp.com
Mr. Jim Reif V Hewlett Packard Co. jim.reif at hp.com
Mr. Matt Otto V I-TECH Corp. matt_otto at i-tech.com
Mr. Steven Wirtz V I-TECH Corp. steve_wirtz at i-tech.com
Mr. George O. Penokie P IBM / Tivoli Systems gop at us.ibm.com
Mr. Dan Colegrove V IBM Corp. dcolegro at us.ibm.com
Mr. John Lohmeyer P LSI Logic Corp. lohmeyer at t10.org
Mr. Brian Day V LSI Logic Corp. brian.day at lsil.com
Mr. Tim Hoglund V LSI Logic Corp. tim.hoglund at lsil.com
Mr. Mark Evans P Maxtor Corp. mark_evans at maxtor.com
Mr. Steve Byan V Maxtor Corp. stephen_byan at maxtor.com
Mr. Rob Haydt A Microsoft Corp. robhay at microsoft.com
Mr. James R. (Bob) P Network Appliance Inc. bob at netapp.com
Davis
Mr. Edward A. Gardner P Ophidian Designs eag at ophidian.com
Mr. Arie Krantz V QLogic Corp. l_krantz at qlc.com
Mr. Jim Coomes V Seagate Technology jim_coomes at seagate.com
Mr. John Worden V Seagate Technology john.worden at seagate.com
Mr. Scott Younger V Seagate Technology Scott.T.Younger at seagate.
com
21 People Present
Status Key: P - Principal
A,A# - Alternate
AV - Advisory Member
L - Liaison
V - Visitor
** Approval of Agenda
The draft agenda was approved:
Approval of Agenda
SAS Bit and byte order for scrambling, CRC and transmission (02-219)
[Jim Coomes]
SAS CRC Generation and Scrambling (02-231) [Coomes]
What does it mean to ignore or discard a frame? [Galloway]
SAS OOB timing (02-198) [Elliott]
SAS Credit Not Ready (02-215) [Bill Galloway]
SAS SMP transport layer state diagrams (02-216) [Penokie]
SAS Port Control State Diagram Update (02-202) [Worden]
SAS transport layer state machines for SSP (02-230) [Mark Evans]
Name consistency between port and transport layers [Worden]
SAS Pathway Recovery (02-256) [Tim Hoglund]
SAS COMMAND ID Removal (02-259) [Brian Day]
SAS Working Draft Review [Elliott]
Review of Recommendations to the Plenary
Meeting Schedule
Items added at the meeting:
none.
Results of the meeting
** SAS Bit and byte order for scrambling, CRC and transmission (02-219)
[Jim Coomes]
Jim Coomes presented 02-219r2, SAS Bit and byte order for scrambling, CRC
and transmission. He received some input on how to name a few items.
Jim Coomes moved that 02-219r3 (r2 as revised) be recommended to T10 for
inclusion in SAS. Bill Galloway seconded the motion. In absence of
objections, the motion carried unanimously.
** SAS CRC Generation and Scrambling (02-231) [Coomes]
Jim Coomes plans to bring in separated code for CRC generation and
scrambling to the SAS meeting next week.
** What does it mean to ignore or discard a frame? [Galloway]
Bill Galloway said that this item has been overcome by events and asked
that it be removed from future agendas.
** SAS OOB timing (02-198) [Elliott]
Rob Elliott presented 02-198r4, SAS OOB timing. He received feedback and
agreed to revise his proposal.
** SAS Credit Not Ready (02-215) [Galloway]
Bill Galloway said that he received the source files from Rob last night.
He will revise his proposal for next week's meeting.
** SAS SMP transport layer state diagrams (02-216) [Penokie]
George Penokie presented 02-216r3, SAS SMP transport layer state diagrams.
George noted some impacts on the port layer and the need to synchronize
some terminology. He received other input and agreed to revise his proposal
for next week.
** SAS Port Control State Diagram Update (02-202) [Worden]
Deferred.
** SSP transport layer state machines (02-230) [Mark Evans]
Deferred.
** Name consistency between port and transport layers [Worden]
George Penokie asked John Worden to prepare a proposal for a single list
containing all of the requests and confirmations between the different
layers. John agreed to do so.
** SAS Pathway Recovery (02-256) [Tim Hoglund]
Tim Hoglund presented 02-256r0, SAS Pathway Recovery. This proposal would
change the SAS pathway recovery method from the current two-pass algorithm
to a one-pass algorithm. It uses a pathway blocked counter instead of the
arbitration wait time.
Jim Coomes was concerned that designers might be tempted to retry as fast
as possible in order to increase their priority (i.e., maximize their
pathway blocked counter value). Tim showed a diagram to explain why this
should not be a big concern. He was asked to prepare a proposal for an
informative annex with his arbitration contention diagrams.
Tim received other input and agreed to revise his proposal for next time
and to get together with John Worden to work on the port layer impacts.
** SAS COMMAND ID Removal (02-259) [Brian Day]
Brian Day presented 02-259r0, SAS COMMAND ID Removal. Bill Galloway found a
case that may not be addressed by Brian's proposal. Brian agreed to examine
Bill's case.
** SAS Working Draft Review [Elliott]
Deferred.
** Review of Recommendations to the Plenary
John Lohmeyer noted that the following recommendations have been made to
the T10 plenary:
Recommendations from the May 14, 2002 teleconference:
that 02-169r2 be accepted for inclusion in the SAS working draft.
that 02-170r1 be accepted for inclusion in the SAS working draft.
Recommendations from the May 21, 2002 teleconference:
none.
Recommendations from the June 5-7, 2002 working group meeting:
that 02-179r1 (r0 as revised) be recommended for inclusion in the SAS
working draft.
that 02-211r1 (r0 as revised) be accepted for inclusion in the SAS working
draft.
that 02-212r1 (r0 as revised) be accepted for inclusion in the SAS working
draft.
that 02-218r0, which recommends that the SMP FER Loopback function be
removed, be accepted and that the SAS technical editor be directed to
remove the SMP FER Loopback function.
that 02-203r1 (r0 as revised) be recommended for inclusion in the SAS
working draft.
that 02-217r0 be recommended for inclusion in the SAS working draft.
that 02-214r1 be recommended for inclusion in the SAS working draft.
Recommendations from the June 18, 2002 teleconference:
that 02-204r1 be recommended for inclusion in the SAS working draft.
that 02-197r2 (r1 as revised) be recommended for inclusion in the SAS
working draft.
Recommendations from the June 24-26, 2002 working group meeting:
that 02-196r2 (r1 as revised) be recommended to T10 for inclusion in SAS.
that 02-201r3 (r2 as revised) be recommended to T10 for inclusion in SAS.
that 02-205r3 (r2 as revised) be recommended to T10 for inclusion in SAS.
that in state SMP_SFR1 in figure 69 in SAS-R00C, that the protocol
violation and the failed frame confirmations be deleted and any
corresponding text be deleted.
that 02-245r0 be recommended to T10 for inclusion in SAM-3.
that 02-246r0 be recommended to T10 for inclusion in SPC-3.
Recommendations from the July 9, 2002 teleconference:
that 02-219r3 (r2 as revised) be recommended to T10 for inclusion in SAS.
** Meeting Schedule
SAS Protocol teleconferences are scheduled for:
Call information:
Tuesday July 30, 2002 and Tuesday August 13, 2002
11:00 am -- 2:00 pm EDT
10:00 am -- 1:00 pm CDT
9:00 am -- noon MDT
8:00 am -- 11:00 am PDT
USA Toll Free Number: 877-417-9828
Toll Number: +1-706-679-9028
Conference Code: 719 533 7560
WebEx Session: http://seagate.webex.com/
Meeting Name: SAS Protocol teleconference
Password: to be announced on T10 reflector
Face-to-face SAS Protocol meetings are scheduled for:
August 21-23, 2002 in Shrewsbury, MA starting at 9:00 am on Wednesday and
ending at noon on Friday. Meeting information is available at:
http://www.t10.org/meeting.htm.
September 9-10, 2002 in Minneapolis, MN with T10. See
http://www.t10.org/ftp/t10/announce/ann-m051.pdf for meeting information
and http://www.t10.org/ftp/t10/mtg_map.txt for meeting times. There will
also be a concurrent SAS Physical meeting.
--
John Lohmeyer Email: lohmeyer at t10.org
LSI Logic Corp. Voice: +1-719-533-7560
4420 ArrowsWest Dr. Fax: +1-719-533-7183
Colo Spgs, CO 80907
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list