Agenda for The SSM meeting Feb 20 -Update Feb 19 - SSM Editing meeting cancelled

Aloisi, Paul paul_aloisi at ti.com
Mon Feb 11 04:34:21 PST 2002


* From the T10 Reflector (t10 at t10.org), posted by:
* "Aloisi, Paul" <paul_aloisi at ti.com>
*

AGENDA SSM MEETING At Seagate
February 20  meeting; 9AM to 6PM SSM meeting at Seagate in Scotts Valley, CA
- Calling will be set up

The editing session has been cancelled, call for new editor

1. AGENDA SSM MEETING
2. Introductions
3. Attendance
4. Agenda development
5. Approval of previous minutes - 
6. Action item review - 
7. Administrative structure
8. Presentation Policy
10. Presentations
10.1 Carry over presentations
10.1.1 Cable extraction data, Jie Fan, Umesh, Madison/Seagate
10.1.1.1 Single pair data extraction from electrical measurements on round
shielded cable, Jie Fan

10.1.1.2 Multiline data extraction from electrical measurements, Umesh
(Bruce)

10.1.1.3 Parameter extraction for transition region models, Bob Gannon

10.1.1.4 Parameter extraction from physical description of twist and flat
constructions, Greg Vaupotic, Amphenol Spectra Strip

10.1.2 Periodic Structures in transmission lines, (Open)

10.1.3 IBIS presentations, (Open)

10.1.5 Models for instrumentation interfaces status, Jason Chou

10.1.6 Backplane presentation, Bruce Manildi

10.2 New presentations
10.2.1 lossy line modeling and eye diagram prediction, Dima Smolyansky

10.2.1 Cable Models and Procedures (02-052) [Bruce Manildi & Umesh Chandra]


10.3 Basic system model, Bill Troop IBM

10.4 SSM-2 Document review -
10.4.1 SSM-2


11. Matrix development for SSM-2
11.1 Overview section: owner, Bill Ham

11.2 Transceiver chips: owner, (Open)

11.3 Bus segment termination: owner, Paul Aloisi / Don Getty

11.4 Host bus adapter (transceiver board): owners, (Need new owner)

11.5 Mated connectors: owner, Martin Ogbuokiri, Steve Wong

11.6 Transition regions: owners, Bob Gannon, Jason Chou

11.7 Bulk cable: owner, Jie Fan, Zane Daggett, Greg Vaupotic

11.8 Backplane: owner, Larry Barnes, Bruce Manildi

11.9 Cable assemblies, owner Jason Chou (Lead), Bob Gannon, Steve Wong
backup

11.10 How to develop IBIS model section 6.2.1, (Open)

12. Simulation integration strategy
12.1 System configurations - Topology, Bruce Manildi

12.2 Data patterns, Bill Ham, Bruce Manildi

12.3 Data rate -  group - Ultra640 & Ultra1280 additions

13. Tools:

14. New business

15. Status of models supplied to the T10 web site

16. Next meetings

April 2 PIP, April 3 PIP editing, April 4 SSM New Hampshire - Hitachi Cable
June 18 SSM, 19 SSM Editing, 20 PIP   Lisle, IL - Molex

17. Action Items:
17.1 Action items from previous meetings

17.2 New action items from present meeting

18. Adjourn




Paul D. Aloisi         Phone: 603-222-8687
Texas Instruments       FAX:    603-222-8700
50 Phillippe Cote St.    Mobile: 603-930-4104
Manchester, NH 03101 Email: paul_aloisi at ti.com
                                Web site: www.ti.com

*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org




More information about the T10 mailing list