Three CAP proposals posted
Elliott, Robert
Robert.Elliott at COMPAQ.com
Thu Apr 18 07:54:16 PDT 2002
* From the T10 Reflector (t10 at t10.org), posted by:
* "Elliott, Robert" <Robert.Elliott at COMPAQ.com>
*
It used to include "and reset" - was that incorrect?
We can go forward with:
a) logical unit reset [implies power cycle and hard reset too]
b) hard reset [implies power cycle too]
c) power cycle [only]
but I'd rather not have:
d) power cycle and maybe hard reset and maybe logical unit reset
---
Rob Elliott, Compaq? Server Storage
Robert.Elliott at compaq.com
> -----Original Message-----
> From: Kevin D Butt [mailto:kdbutt at us.ibm.com]
> Sent: Wednesday, April 17, 2002 7:27 PM
> Subject: Re: Three CAP proposals posted
>
> With regards to 02-134r0:
> In section 7.33.6 the sentence change,
> "The downloaded code shall then be effective after each
> (power-cycle and reset)
> logical unit reset until it is supplanted in..."
> Changes the concept of when a download microcode takes effect
> from a power cycle to any logical unit reset. Not all devices will
> necessarily begin
> executing the new microcode with a Logical Unit Reset. Some devices
> require a power cycle before they will begin executing the new code.
>
> Regards,
>
> Kevin D. Butt
> IBM Tape Products
> SCSI and Fibre Channel Microcode Development
> 6TYA, 9032 S. Rita Rd.
> Tucson, AZ 85744
> Office: (520)799-5280, Tie-line 321
> Lab: (520)799-2869
> Fax: (520)799-4062
> Email: kdbutt at us.ibm.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at t10.org
More information about the T10
mailing list