STA Technical Meeting agenda Nov 5
Aloisi, Paul
aloisi at unitrode.com
Tue Oct 13 10:38:34 PDT 1998
* From the T10 (formerly SCSI) Reflector (t10 at symbios.com), posted by:
* "Aloisi, Paul" <aloisi at unitrode.com>
*
STA Technical Agenda
SCSI Harbor
November 5,1998 Palm Springs, CA
The SCSI Harbor meeting will follow 30 minutes after the T10 plenary on
Thursday July 16 - starting no sooner than 2:00PM. (If the plenary runs =
until 3:30PM, then the Harbor meeting would start at 4:00PM. If the plenary
runs until noon, SCSI Harbor will start at 2:00PM.
Agenda
1. Opening Remarks and Introductions
2. Approval of Agenda
3. Attendance and Membership
4. Approval of Minutes - September 17, 1998 Meeting in St Petersburg,
FL (98s0xxr0)
5. Document Distribution www.scsita.org/harbor
<http://www.scsita.org/harbor>
6. SCSI Roadmap [Mark Delsman]
7. Review of Old Action Items
7.1 Tom Winsemius will provide the content for sections 2.6
(EMI), 2.10 (Shock and Vibration), 2.11 (Thermal Management) and 6.0
(Handling, ref IDEMA). Carry over.
7.2 Pat McGarrah will get someone to help Benjie write the
Wrapper to Connector specifications. Carry over.
7.3 Pat McGarrah will edit sections 1.1 through 1.3. Carry
over.
7.4 Pat McGarrah will provide prototype wrappers to other
drive vendors for thermal testing.
7.5 The other drive vendors will do thermal testing present
results and anticipated future needs.
7.6 Jay Neer will get details on 19" rack mechanical
dimensions.
8. Document Review [Benjie Sun] (98s004R4)
9. Old Business
9.1 Testing Strategy [Ham]
10. New Business
11. Review of Action Items
12. Meeting Schedule
March 11, 1998 in Sarasota, FL.
13. Adjournment
Paul D. Aloisi Phone: 603-429-8687
Unitrode MS 84 FAX: 603-429-8963
7 Continental Blvd Email: aloisi at unitrode.com
Merrimack, NH 03054 Web site: www.unitrode.com
<http://www.unitrode.com>
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at symbios.com
More information about the T10
mailing list