Does TST == 001b break initiator software?
PJohansson
PJohansson at aol.com
Fri Apr 3 13:10:25 PST 1998
* From the T10 (formerly SCSI) Reflector (t10 at symbios.com), posted by:
* PJohansson <PJohansson at aol.com>
*
In a message dated 98-04-03 15:52:00 EST, larryc at maxstrat.com writes:
<<Correct me if I am wrong but wasn't multi-initiator (which includes multi-
pathing to the same LUN WWN) support for the basic queuing model off limits
(i.e., NOT supported). If this is true then I would agree that Abort Task Set
and Clear Task Set could be treated the same when TST equals 001b.>>
No, basic task management as accepted in 96-198r4 is silent on multiple
initiator support---hence it is permitted. Within SBP-2 it has never been the
intent to bar such implementations.
Regards,
Peter Johansson
Congruent Software, Inc.
3998 Whittle Avenue
Oakland, CA 94602
(510) 531-5472
(510) 531-2942 FAX
pjohansson at aol.com
*
* For T10 Reflector information, send a message with
* 'info t10' (no quotes) in the message body to majordomo at symbios.com
More information about the T10
mailing list