Updated January '94 Meeting Map

John Lohmeyer jlohmeye at ncr-mpd.ftcollinsco.NCR.COM
Fri Dec 31 13:43:57 PST 1993


                     Meeting Map -- January 9-14, 1994 -- San Diego, CA
                                     (12/31/93 Version)

Sunday 1/9         9   10  11  12  1   2   3   4   5
                                     +=============+
                                     |Gen Edit Sess|              (10)
                                     +=============+

Monday 1/10        9   10  11  12  1   2   3   4   5   6   7   8
                   ********************+=======================+
                   * Small Form Factor | ATA Working Group     |  (40)
                   ********************+===========+===========+
                   | SCSI CAM Working Group        | FC-AL WG  |  (25)
                   +===============+===============+-----------+
Moved to Tuesday-->////////////////*/P1394/Connector///*//////////(20)
                   +---------------+---------------+****
New 12/31       -->| IPI3                          |              (10)
                   +-------------------------------+

Tuesday 1/11       9   10  11  12  1   2   3   4   5   6   7   8
                   *****************---------------+
                   * SSA-UIG       *X3T10.1 (SSA)  |              (30)
                   +===============================+===========+
                   | SCSI-3 WG (Letter Ballot Resolution)      |  (50)
                   +===============================+===========+
                   |    FC-EP + IG + SB            * FCA       *  (55/25)
                   +-------------------------------+***********+
                   | RAID SG / RAB                 |              (40)
                   +===============================+
New 12/17     -->  * P1394 Connector Task Group    *              (20)
                   +*******************************+
New 12/17     -->  * P1394 Plenary Meeting         *              (??)
                   +*******************************+

Wednesday 1/12     9   10  11  12  1   2   3   4   5   6   7   8
                   +===========================================+
                   | SCSI-3 WG                                 |  (55)
                   +===============================+***********+
                   |    FC-EP & Fabric Services    |FC-LE Edit |  (55/15)
                   +-------------------------------+-----------+
                                                   | FC-RT     |  (20)
                   +-------------------------------+-----------+
New 12/17     -->  * P1394 Plenary Meeting         *              (??)
                   +*******************************+

Thursday 1/13      9   10  11  12  1   2   3   4   5   6   7   8
                   +============+  +===========================+
                   | SSP WG     |  | X3T10 (was X3T9.2)        |  (40/90)
                 +-+------------+--+===============+===========+
                 | FC N_PORT/F_PORT MIBS           |              (10)
                 +-+-------------------+-----------+
Moved to Monday->|/IPI-3///////////////|//////////////////////////(10)
                 +---------------------+                        

Friday 1/14    8   9   10  11  12  1   2
                 +=====================+
                 | X3T10 (was X3T9.2)  |                          (90)
                 +=====================+

Meetings marked with == are X3T9.2-authorized meetings.
Meetings marked with -- are X3T9.3- or .7-authorized meetings.
Meetings marked with ** are non-X3T9 sponsored meetings.

Abbreviation Key:
AL:         Arbitrated Loop
ATA:        AT Attachment (a.k.a. IDE)
CAM:        Common Access Method
EP:         Enhanced Physical
FC:         Fibre Channel
FCA:        Fibre Channel Association
IG:         Implementation Guide
IPI3:       Intelligent Peripheral Interface
LE:         Link Encapsulation
MIBS:       Management Information Bases
P1394:      IEEE Project on High Performance Serial Bus
RAB:        RAID Advisory Board
RAID:       Redundant Array of Independent Devices
RT:         Real Time
SB:         Single-Byte Command Code Sets
SG:         Study Group
SSA:        Serial Storage Interface
SSP:        Serial Storage Protocol (Protocol for SSA)
UIG:        User Interest Group
WG:         Working Group (same as Ad Hoc Group)
X3T10:      Lower Level Interfaces Technical Committee (was X3T9.2)
X3T10.1:    SSA Task Group of X3T10 (was X3T9.7)

-- 
John Lohmeyer            E-Mail:  John.Lohmeyer at FtCollinsCO.NCR.COM
NCR Corp.                 Voice:  719-573-3362
1635 Aeroplaza Dr.          Fax:  719-597-8225
Colo Spgs, CO 80916    SCSI BBS:  719-574-0424 300--14400 baud (16800 HST)




More information about the T10 mailing list