InterNational Committee for Information Technology Standards

INCITS Secretariat, Information Technology Industry Council (ITI)
1250 Eye St. NW, Suite 200, Washington, DC 20005
Telephone 202-737-8888; Fax 202-638-4922;
 

   
Doc: 

in071358

Date:

September 11, 2007

Reply to:  Barbara Bennett or 202-626-5743
To: Mr. John Lohmeyer, INCITS T10 Chairman

Dear John:

Subject: Notification to INCITS T10 for 2008 National Standards Maintenance Recommendations 

In accordance with INCITS procedures, action must be taken during the four-year anniversary of a standard's approval date to either reaffirm, revise, withdraw or stabilize the standard. Five-year maintenance actions should be completed before the end of the year (December 2008).

If the TC recommendation is revision, a project proposal describing the proposed revision should be submitted with the recommendation to reaffirm, pending revision. If a standard is currently under revision, the customary four-year action would be reaffirmation of the current standard, pending completion of the revision. See the INCITS/RD-2, Section 5.2.

If the TC recommendation is stabilization, at least five years must have passed since the previous reaffirmation, without any modifications. If it is determined that the standard should be designated as a stabilized standard, the TC shall include the rationale for the recommendation with the vote. See the INCITS/RD-2, Section 5.2.7.

Requested Action

According to the records of the INCITS Secretariat, your TC should review the attached list of standards and forward a recomendation to reaffirm, revise, withdraw or stabilize each standard listed below. This review should include any associated amendments and corrigenda.

Each recommendation may be approved (2/3 rule) by TC letter ballot. Additionally, for approvals (2/3 rule) conducted at a TC meeting, the withdrawal and stabilization recommendation is by roll-call vote and a reaffirmation recommendation is by meeting vote. Upon approval by the Technical Committee, the recommendation(s) should be forwarded to the INCITS Secretariat for action by January 14, 2008.

If a recommendation is not forthcoming from the technical committee by January 14, 2008, the INCITS Executive Board shall make a recommendation on this issue without the benefit of the Technical Committee's input at their next meeting.

Please contact me, if you have any questions.

Sincerely,

Barbara Bennett
Associate Manager, Standards Operations


Attachment


TC: T10 - SCSI storage interfaces
Project: 996 - M
Standard INCITS 306 :1998 [R2003]
Title: SCSI-3 Block Commands (SBC)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 999 - M
Standard INCITS 314 :1998 [R2003]
Title: SCSI-3 Medium Changer Commands (SMC)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1142 - M
Standard INCITS 302 :1998 [R2003]
Title: SCSI-3 Parallel Interface - 2 (SPI-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08..

TC: T10 - SCSI storage interfaces
Project: 1144 - M
Standard INCITS 350 :2003 [ ]
Title: SCSI Fibre Channel Protocol - 2 (FCP-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1155 - M
Standard INCITS 325 :1998 [R2003]
Title: SCSI-3 Serial Bus Protocol 2 (SBP-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1157 - M
Standard INCITS 366 :2003 [ ]
Title: SCSI Architecture Model-2 (SAM-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1212 - M
Standard INCITS 305 :1998 [R2003]
Title: SCSI Enclosure Services (SES)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1212 - M
Standard INCITS 305:1998/AM1 :2000 [R2003]
Title: Information Technology - SCSI - Enclosure Services (SES) - Amendment 1
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1225 - M
Standard INCITS 318 :1998 [R2003]
Title: SCSI Controller Commands - 2 (SCC-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1240 - M
Standard INCITS 330:2000/AM1 :2003 [R2005]
Title: Information Technology - SCSI - Reduced Block Command Set (RBC) - Amendment 1
Status: TTC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1434 - M
Standard INCITS 380 :2003 [ ]
Title: Information technology - SCSI Stream Commands -2 (SSC-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1439 - M
Standard INCITS 368 :2003 [ ]
Title: Information Technology - SCSI Passive Interconnect Performance (PIP)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1514 - M
Standard INCITS 369 :2003 [ ]
Title: Information technology, SCSI Signal Modeling (SSM-2)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1525 - M
Standard INCITS 367 :2003 [ ]
Title: Information technology, SCSI Parallel Interface - 5 (SPI-5)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08.

TC: T10 - SCSI storage interfaces
Project: 1562 - M
Standard INCITS 376 :2003 [ ]
Title: Information technology - Serial Attached SCSI (SAS)
Status: TC notified of maintenance requirement in in071358. TC recommendation is due 01/14/08