INCITS Secretariat,
Information
Technology Industry Council (ITI)
1250 Eye St. NW, Suite 200, Washington, DC 20005
Telephone 202-737-8888; Fax 202-638-4922
Doc: |
T10/06-084r0 (in060089) |
Date: |
January 20, 2006 |
Reply to: |
Parthenia Purnell, 202-626-5741 |
To: |
Mr. John Lohmeyer, INCITS T10 Chairman |
Dear Mr. Lohmeyer:
Subject: 2006 Five-Year Maintenance
Review of INCITS/T10
Standards
In accordance with ANSI and INCITS
policy, action
must be taken during the four-year anniversary of a standard's approval
date to
either reaffirm or withdraw the standard. Should the TC's review result
in a
recommendation to revise a standard, a project proposal describing the
proposed
revision should be submitted with the recommendation to reaffirm,
pending
revision. If a standard is currently under revision, the customary
four-year
action would be reaffirmation of the current standard, pending
completion of
the revision.
Five-year maintenance actions should be
completed
(including a 45-day public review and 30-day INCITS letter ballot,
followed by
the 14-day request for BSR-9 approval) before the end of the year
(December
2006).
According to the records of the INCITS
Secretariat, your TC should review the attached list of standards and
forward a
recomendation to reaffirm or withdraw each standard listed below. This
review
should include any associated amendments and corrigenda.
Each recommendation may be approved (2/3
rule) by
TC letter ballot. Additionally, for approvals (2/3 rule) conducted at a
TC
meeting, a withdrawal recommendation is by roll-call vote and a
reaffirmation
recommendation is by meeting vote. Upon approval by the Technical
Committee,
the recommendation should be forwarded to the INCITS Secretariat for
action by March 31, 2006.
If a recommendation is not forthcoming
from INCITS/T10 by March
31, 2006, the
INCITS Executive Board shall make a recommendation on this issue
without the
benefit of the Technical Committee's input.
Your expeditious action is appreciated.
Please
contact me, if you have any questions.
Sincerely,
Parthenia J. Purnell
Associate Manager, Standards Processing
T10 I/O Interface - Lower Level (2006 Action)
TC: |
T10 - SCSI storage interfaces |
Project: |
792 - M |
Standard |
INCITS 232 :1996 [R2001] |
Title: |
SCSI-2 Common Access Method Transport and SCSI Interface Module |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
989 - M |
Standard |
INCITS 295 :1996 [R2001] |
Title: |
Serial Storage Architecture - Transport Layer-1 (SSA-TL1) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
993 - M |
Standard |
INCITS 269 :1996 [R2001] |
Title: |
SCSI-3 Fibre Channel Protocol (FCP) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
994 - M |
Standard |
INCITS 270 :1996 [R2001] |
Title: |
SCSI-3 Architecture Model (SAM) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
1121 - M |
Standard |
INCITS 294 :1996 [R2001] |
Title: |
Serial Storage Architecture - SCSI-2 Protocol (SSA-S2P) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
1145 - M |
Standard |
INCITS 293 :1996 [R2001] |
Title: |
Serial Storage Architecture - Physical Layer 1 (SSA-PH1) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |
TC: |
T10 - SCSI storage interfaces |
Project: |
1236 - M |
Standard |
INCITS 351 :2001 [ ] |
Title: |
SCSI Primary Commands - 2 (SPC-2) |
Status: |
TC notified of maintenance requirement in BROKEN LINK TO in060089.htm REMOVED. TC recommendation due 03/31/06. |